Construction Project for Stormwater Treatment Facilities


Project details
  • Project name Construction Project for Stormwater Treatment Facilities on Putinų Street, Alytus"
  • Design year 2024
  • Building type Stormwater Drainage Networks. Other Engineering Structures – Stormwater Treatment Facilities
  • Construction type Construction of a New Building, Classified as a Special Structure
Service description
Developed a detailed technical design for stormwater drainage networks and stormwater treatment facilities, including approximately 26 meters of D500–600 mm diameter drainage pipelines and a treatment plant with a capacity of 560 l/s
Projects